EVM437x

EVM437x is a fully functional development board based on SOM437x,which perfectly supports Linux4.4.19 operating system and.EVM437 is suitable for the rapid development and verification of products in different industries.

Application Areas

  • Networked Industrial Drive Controller
  • Consumer Medical Instruments
  • Human-Machine-Interface
  • Navigation Equipment
  • Barcode Scanner
  • Portable Data Terminal
  • Test Measurement
  • Industrial Automation

Specifications

Core Board
CUP

TI AM437x

processor

ARM Cortex-A9 CPU@300M - 1GHz,Integrated SGX530

RAM

256M、512M、1G、2G DDR3

FLASH

8G – 64G eMMC

256M-1G Nand FLASH

8Mbyte SPI FLASH

Power management

TPS65218B1RSL

Substrate
display output

1x HDMI @Top support for 1920X1080

1x LVDS

Touch screen

1x Touch Screen

GigE

1xRJ45 interface

serial port

1xRS485 / 1xRS232 / 2xUART TTL serial port

audio

LINE-IN & LINE-OUT

USB

2x USB2.0 Host

1x USB OTG

work environment
working temperature

0℃ ~ 70℃

Working humidity

RH40% ~ RH90%

working voltage

9V / 12V / 15V

Core board structure diagram

Consultation & Ordering

FAE

Sales

Contacts

Mr. Ken

Miss Jessy

Call phone

(+86) 131 6089 2388

(+86) 131 1959 1334

E-mail

support@ema-tech.com

sales@ema-tech.com

本网站由阿里云提供云计算及安全服务